top of page

Project 1- Fettucine Truss Bridge

Objective - 

 

- To develop student’s understanding of tension and compressive strength of construction materials

- To develop student’s understanding of force distribution in a truss

- To design a perfect truss bridge which fulfils the following criterias: High efficiency, Minimal construction Material

 

 

 

 

Group & Individual Component Report

Learning Outcome - 

 

- Able to evaluate, explore and improve attributes of construction materials

 

- Learned to explore and apply understanding of load distribution in a truss

 

- Able to evaluate and identify tension and compression members in a truss structure

 

- Learned to explore different arrangement of members in a truss structure

 

- Learned to work with people and different ideas

Project 2 - Extension Of A R.C Bungalow

Objective - 

 

- To introduce the basic process of building structures design process to the students.

- To enable the students to have a holistic experience including Concept and Structure Layout Design, Building Structure Engineering Considerations, Structure Members Sizing and Calculations, Final Report and Presentation.

 

 

 

 

Group Component Report

Individual Component Report

Learning Outcome - 

 

- Able to produce a complete documentation on structural system of a case study


- Learned to explore and understand the concept of structural analysis


- Able to Identify structural components


- Able to recognize, execute and implement basic procedures of building structure design


- Learned to produce a structural proposal

 

- Learned to calculate Live load and dead load acting on Beam, Slab and columns

© 2014 by Joshua Lee Yee Kai.

bottom of page